Government of India
# | Activity/Sub-Activity | Budget allocation | Nature of activity | Timeline | Responsible Dept/Agency |
---|---|---|---|---|---|
1 | Policy and Regulatory Framework | 0 | Short Term | ||
1.1 | Preparation of a comprehensive action plan for elimination of single use plastics | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
1.2 | Policy for inclusion of components relating to elimination of SUP and remediation/management of legacy waste in project proposals under SBM 2.0 | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
1.3 | Policy for development of decentralised recycling infrastructure/End of Life Disposal infrastructure, with special focus on low-value plastics | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
1.4 | Adoption of sustainable public procurement policy for products and plastic packaging material made of recycled plastics, and alternatives to identified single use plastics, as per applicable standards | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
2 | Institutional Mechanism | 0 | Short Term | ||
2.1 | Constitution of District Level Task Force (excluding million plus cities) under District Magistrate | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
2.2 | Setting up of a plastic waste management cell at State (Each in Urban and Rural Development Departments or the concerned Departments), District (in Zilla Parishad for all therural areas), in each ULB | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
3 | Management of littered single use plastic items in Rural Areas | 0 | Short Term | ||
3.1 | Identification of littering hot spots with respect SUP items and development of strategy for their collection and further management | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
3.2 | Identification of ingress points of littered single use plastic items in surface water bodies and drains and strategy for prevention at GP level | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
3.3 | Phased plan for cleaning surface water bodies, and drains of floating singles use plastic items and their further management at GP level | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
3.4 | Document total quantity of plastic waste present in legacy waste sites and implementation of plan to manage legacy plastic waste - location-wise (GP level) | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
3.5 | Activities to be specifically included under Swachh Bharat Mission 2.0 for SUP elimination and management of legacy waste sites, as per guidelines | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4 | Plastic waste management including single use plastics | 0 | Short Term | ||
4.1 | Assessment of plastic waste generation in GPs | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4.2 | Assessment of infrastructure required for plastic waste management – collection , segregation, recycling / EOLD- for GPs | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4.3 | Details of infrastructure for collection, segregation and channelization of plastic waste to recyclers/EOLD for GPs | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4.4 | Gap analysis and strategy for development of infrastructure for PWM for GPs | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4.5 | Leveraging of funds undue Swachh Bharat Mission 2.0, as per guidelines | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
4.6 | Strategy for collection and segregation of plastic waste at the GP level | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
5 | Plastic recycling infrastructure and end of life disposal facilities | 0 | Short Term | ||
5.1 | Development of database of recyclers of plastic category wise and also EOLD entities for non ULB areas | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
5.2 | Development of plan/incentive scheme for promotion of setting up of recycling facilities category wise | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
5.3 | Development of industrial composting facilities for compostable plastics: Number and quantity | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
5.4 | Development of infrastructure/incentive scheme for EOLD, -Waste to oil, waste to energy, road construction, coprocessing cement kilns | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
6 | Data collection and monitoring mechanism | 0 | Short Term | ||
6.1 | Development of online database and monitoring system covering items covered under Comprehensive Action Plan | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
6.2 | Online public grievance/complaints portal | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
6.3 | Mechanism to undertake regular quarterly survey for (i) prohibited single-use plastic items in plastic waste and (ii) compositional characterization of plastic waste in the following categories (a) Rigid plastic packaging including multilayered packaging, (b) Flexible plastic packaging -single layered and multilayered of the plastics only and (c) Multi layered multimaterial(at least one layer of plastic and at least one layer of other material) plastic packaging | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
7 | Awareness generation and capacity building | 0 | Short Term | ||
7.1 | Preparation of road map for awareness generation activities at Village level for citizens, institutional waste generators, RWAs/Market associations | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
7.2 | Strategy for targeted campaign at littering hotspots such as tourist spots, places of religious and cultural importance, weekly markets, urban sprawls against littering, and promoting alternate packaging material | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 | |
7.3 | Capacity building for repurposing and promoting reuse of plastic packaging | 0 | Short Term | ||
7.4 | Capacity building of Zilla Parishads for PWM | 0 | Short Term | ||
8 | Action taken for reducing /elimination of single use plastic items in State/UT Government offices, attached /subordinate offices, PSUs/ organization | 0 | Short Term | ||
8.1 | Implementation of actions given in Standard Guidelines for single use plastic issued earlier by the Ministry (enclosed) | 0 | Short Term | As per the Swachh Bharat Mission (Grameen)- Phase- II timeline from 2020-21 to 2024-25 |